1.Fundamental Requirements for Die Design Checking
將進(jìn)行三輪模具設(shè)計校核:
1.1 The service supplier will carry out three rounds of die design checking:
模具設(shè)計校核基本要求
1. Cast check, 檢查
2. Steel check 鋼檢查
3. Final check 最后檢查
For each round the supplier need check the die design for adherence
對于每一輪,需要檢查模具設(shè)計是否符合要求。
? to the die manufacturing approval protocol MAP (FAP), which defines the materials to be used, etc. at the end of the method planning period.
對模具制造批準(zhǔn)協(xié)議MAP (FAP),在方法規(guī)劃期結(jié)束時定義要使用的材料等。
? to the requirements of Press-line and flow chart (DLP).
符合壓線和流程圖(DLP)的要求
? to warrant functionality and avoid collision risks in the die design.
保證模具設(shè)計的功能性并避免碰撞風(fēng)險。
? to casting die design requirements (breakage, metal flow, etc.)
?符合鑄造模具設(shè)計要求(破損,金屬流動等)
1.2 The verification of the die design will be based on a check list (DSCL) provided by VWA. The issues found shall be documented with pictures (screen shots) with an explanation using a VWA template. Recommendation to solve the issues shall be included (example: increase casting width, optimization of functionality, etc.)
模具設(shè)計的驗證將基于VWA提供的檢查表(DSCL)。發(fā)現(xiàn)的問題應(yīng)以圖片(屏幕截圖)
記錄,并使用VWA模板進(jìn)行解釋。應(yīng)包括解決問題的建議(例如:增加鑄件寬度,優(yōu)
化功能等)
The results of the die design check might need to be discussed with VWA and the die manufacturer.
模具設(shè)計檢查的結(jié)果需要與VWA和模具制造商進(jìn)行討論。
Catia操作熟練。
More than 8 years experience in stamping mold design and audit.
8年以上沖壓模具設(shè)計和審核經(jīng)驗。
Familiar with VW standard, VW porject experience is preferred.
熟悉大眾標(biāo)準(zhǔn),有大眾項目經(jīng)驗者優(yōu)先。
Know well about mold desigh of body side, fender, aspect parts.
熟悉車身側(cè)面、擋泥板、車身外延件的模具設(shè)計。
工作地點(diǎn)不限,可居家辦公,全職兼職都可以